Thursday, February 07, 2008

Ancestry : LCIA Version 3.5 : DELIVER LOGISTIC SUPPORT : MAINTAIN : 11. Maintenance : 11.3 Monitor & Control Maintenance

The page is loading. Please wait...

If you continue to see this message then either your browser has blocked active content or JavaScript is disabled or not supported on your browser. If you browser has blocked active content then you will need to "Allow Blocked Content..." from the bar at the top of this window.

 

Actual Performance DataCost to maintain10.2.3.4 Manage ObsolescenceSupercession Need10.2.3.5 Manage SupersessionConfiguration StructureMaintenance Feedback06.2.1 Administer ChangeItem ConditionMaintenance Task StatusItem ConditionConditioning DecisionConditioning DecisionItem Consumption Details10.3.1 Find Stock Solution10.2.2 Forecast demand10.6.3 Manage Reconditioning / Repair Interface10.6.2 Manage Items with Shelf Life10.2.3.6 Manage bans, constraints and concessionsActual Performance Data16.2 Performance  MonitoringPeformance Data Requirement16.1 Metric IdentificationMaintenance Feedback03.3.2 Monitor and Control Fleet Support Structure ChangeMAINTAINHelp with a Flow ModelMaintenance Feedback03.2.2 Monitor and Control Fleet Composition ChangeActual Maintenance Costs 17.4 Financial AccountingMaintenance Feedback17.1 Planning budgeting and forecastingInfrastructure resource releasedInfrastructure utilisation dataHR resources releasedHR Utilisation Data13.2 Infrastructure Resource Management13.1 Human Resource ManagementMaintenance Plan Execution Status11.1.1 Scope MaintenanceMaintenance Feedback03.4.2 Plan and Initiate Sustainment TasksMaintenance Feedback03.4.4 Monitor and Control Sustainment TasksAsset ReleaseConfiguration StructureItem ConditionMaintenance ReportPerformance and Usage DataItem Condition03.5.2 Match Assets to Op Task03.4.5 Audit asset11.3 Monitor & Control MaintenanceLCIA Version 3.5Maintenance Feedback09.5 Manage EnvironmentMaintenance Feedback09.4 Manage SafetyMaintenance Lessons IdentifiedPerformance and Usage Data09.3 Design Intent11.2.2 Perform Maintenance TaskHR resources releasedHR Utilisation DataInfrastructure resource releasedInfrastructure Utilisation DataMaintenance Task StatusMaintenance Task Non Conformance Detail11.2.3 Close Maintenance Task11.3.1 Task Assurance11.3.3 Report Maintenance11.3.3 Report Maintenance
This activity collate all feedback against tasks, assets and resources/material for a given selection (maintenance opportunity/ asset/ time) and presents the information in a prescribed format.
  • LCIA

16B7410AE3D340B6B39014A5F5A1E28E

738A662ECAD145519E79B128C1B28D29