
This function provides the high level plan for the physical embodiment of approved upgrades (changed/ improved capability) to assets - based on fleet perspective
-
Availability: Depth: Industry
-
Availability: Forward: Industry
-
Capability: Depth: Industry
-
Capability: Forward: Industry
-
Spares Inclusive: Depth: MOD
-
Spares Inclusive: Forward: MOD
-
Traditional: Depth: MOD
-
Traditional: Forward: MOD
LCIA
7419FF0099DF4A5D988CAC3BC5BF744B
738A662ECAD145519E79B128C1B28D29
Inputs
-
Asset Capability Upgrades Required
-
Asset Change Embodiment Schedule
-
Audit Evaluation
-
Budget
-
Change Audit Task
-
Change Validation Task
-
Cost information
-
Design Change Impact
-
Environment Non Conformance Detail
-
Functional Obsolescence Notice
-
Implementation Task
-
Obsolescence Plan
-
Product Design
-
Support Solution Design
-
Technical Obsolescence Notice
-
Verification Evaluation
Outputs
Incoming
Outgoing
-
03.1 Structure Fleet Activity Model
-
03.1.1 Define Fleet Composition Activity Insight Model
-
03.1.3 Plan Upgrades Activity Insight Model
-
03.2.1 Initiate Fleet Composition Change Activity Insight Model
-
03.3.1.1 Identify Support Structure Change Needs Activity Insight Model
-
03.4.1 Identify Sustainment Tasks Activity Insight Model
-
06.1.4.2 Plan configuration Verification Activity Insight Model
-
06.1.4.4 Evaluate configuration Verification Activity Insight Model
-
06.1.5.2 Plan configuration audit Activity Insight Model
-
06.1.5.4 Evaluate configuration audit Activity Insight Model
-
09.1.1 Design Physical Product Activity Insight Model
-
09.2 Design Support Solution Activity Insight Model
-
09.3 Design Intent Activity Insight Model
-
10.2.3.4 Manage Obsolescence Activity Insight Model
-
10.6.1 Manage Packs and Assemblies Activity Insight Model
-
11.1.1 Scope Maintenance Activity Insight Model
-
12.2.02 Analyse Markets Activity Insight Model
-
17.1 Planning budgeting and forecasting Activity Insight Model
-
19.1.3 Check for Suitable Existing Contract / Quote Activity Insight Model
-
FLEET AND ASSET Activity Model
B.1 Fleet / Asset Availability Planning
Level 2
*10.2.3.4 - 03.1.3
03.1.3 - 06