
The production of the design and / or re-design of physical products.
-
Availability: Depth: Industry
-
Capability: Depth: Industry
-
Spares Inclusive: Depth: Industry
-
Traditional: Depth: Industry
LCIA
CEA7650BB8A7446F98474827154D0B78
738A662ECAD145519E79B128C1B28D29
Inputs
-
Approval to Develop a Design Change
-
Asset Capability Upgrades Required
-
Budget
-
Business Objectives
-
Change Record
-
Class Of Change
-
Codification Policy
-
Configuration Structure
-
Design Change Request
-
Design Intent
-
Functional Obsolescence Notice
-
Higher Intent
-
Impact Assessment Instruction
-
ITEA
-
Obsolescence Plan
-
Product Baseline
-
Product Structure
-
Release Instruction
-
Support Solution Design
-
Support Solution Issues
-
Technical Obsolescence Notice
-
TLMP
Outputs
Incoming
Outgoing
-
*09.1.1 - *10.5.4
-
*09.1.1 - *10.5.5
-
*09.1.1 - *10.6.1
-
09.1.1 - *10.1.1
-
09.1.1 - *10.1.2
-
09.1.1 - *10.2.3.4
-
09.1.1 - *10.2.5.5
-
09.1.1 - *10.6.3
-
09.1.1 - 03.1.1
-
09.1.1 - 03.1.3
-
09.1.1 - 03.4.2
-
09.1.1 - 06.1.2.1
-
09.1.1 - 06.1.3.1
-
09.1.1 - 06.1.4.1
-
09.1.1 - 06.1.4.3
-
09.1.1 - 06.1.5.1
-
09.1.1 - 06.1.5.3
-
09.1.1 - 06.2.1
-
09.1.1 - 06.2.2.1
-
09.1.1 - 06.2.2.2
-
09.1.1 - 06.2.3.1
-
09.1.1 - 06.2.3.2
-
09.1.1 - 08.1
-
09.1.1 - 09.1.2
-
09.1.1 - 09.1.3
-
09.1.1 - 09.1.4
-
09.1.1 - 09.2
-
09.1.1 - 09.4
-
09.1.1 - 09.5
-
09.1.1 - 10
-
09.1.1 - 11.1.1
-
09.1.1 - 11.1.2
-
09.1.1 - 11.2.1
-
09.1.1 - 11.2.2
-
09.1.1 - 15
-
09.1.1 - 17.4
-
01. Strategy and Planning Activity Insight Model
-
03.1.1 Define Fleet Composition Activity Insight Model
-
03.1.3 Plan Upgrades Activity Insight Model
-
03.4.1 Identify Sustainment Tasks Activity Insight Model
-
03.4.2 Plan and Initiate Sustainment Tasks Activity Insight Model
-
06.1.2.1 Specify generic structure Activity Insight Model
-
06.1.2.2 Define configuration structure Activity Insight Model
-
06.1.3.1 Establish / Update baseline Activity Insight Model
-
06.1.3.2 Release baseline Activity Insight Model
-
06.1.4 Perform Configuration Verification Activity Model
-
06.1.4.1 Scope configuration Verification Activity Insight Model
-
06.1.4.3 Execute configuration Verification Activity Insight Model
-
06.1.5 Perform Configuration Audit Activity Model
-
06.1.5.1 Scope configuration audit Activity Insight Model
-
06.1.5.3 Execute configuration audit Activity Insight Model
-
06.2.1 Administer Change Activity Insight Model
-
06.2.2.1 Perform preliminary assessment Activity Insight Model
-
06.2.2.2 Perform impact assessment Activity Insight Model
-
06.2.3.1 Assess solution option risks Activity Insight Model
-
06.2.3.2 Cost solution option Activity Insight Model
-
06.2.3.4 Authorise change to be designed Activity Insight Model
-
08.1 Identify Training Activity Insight Model
-
09.1 Design Product Activity Model
-
09.1.1 Design Physical Product Activity Insight Model
-
09.1.2 Integrate & Test Product Activity Insight Model
-
09.1.3 Qualification & Certification Activity Insight Model
-
09.1.4 Acceptance Activity Insight Model
-
09.2 Design Support Solution Activity Insight Model
-
09.3 Design Intent Activity Insight Model
-
09.4 Manage Safety Activity Insight Model
-
09.5 Manage Environment Activity Insight Model
-
10.1.1 Develop long term supply plan Activity Insight Model
-
10.1.2 Plan core supply capability Activity Insight Model
-
10.2.1 Develop inventory policy Activity Insight Model
-
10.2.3.4 Manage Obsolescence Activity Insight Model
-
10.2.5.5 Maintain item catalogue Activity Insight Model
-
10.5.4 Dispose of items Activity Insight Model
-
10.5.5 Account for items Activity Insight Model
-
10.6.1 Manage Packs and Assemblies Activity Insight Model
-
10.6.3 Manage Reconditioning / Repair Interface Activity Insight Model
-
11.1.1 Scope Maintenance Activity Insight Model
-
11.1.2 Structure Maintenance Activity Insight Model
-
11.2.1 Allocate Maintenance Task Activity Insight Model
-
11.2.2 Perform Maintenance Task Activity Insight Model
-
15. Manufacture / Source Activity Insight Model
-
17.4 Financial Accounting Activity Insight Model
-
18.1 Business Strategy Activity Insight Model
-
ENGINEER Activity Model
C.2 Initial Design
Level 2