| L: Explanation of Function | |
| 09. Engineering | |
| 09.1 Design Product | The production, integration, testing, certification and acceptance of the design or redesign of a physical product. |
| 09.2 Design Support Solution | Analyse the supportability of the design and / or re-design and influences the design. Once the design is finalised the optimised Support Solution will be derived looking at all elements required e.g. Training, Tech Pubs, Maintenance, facilities, tools etc |
| 09.3 Design Intent | Activity to ensure that the design objectives are reached / maintained efficiently by the asset. Including analysis (DRACAS), performance and authorisation of all events (Concession, limitations, faults, obsolescence etc) that impacts conformance to the design. |
| 09.4 Manage Safety | This function manages the safety of a product by analysis of design, the support (including training and current material state (technical integrity) of the product |
| 09.5 Manage Environment | This function manages the environmental aspects of a product by analysis of design, the support (including training and current material state (technical integrity) of the product |
| 09.1 Design Product | |
| 09.1.1 Design Physical Product | The production of the design and / or re-design of physical products. |
| 09.1.2 Integrate & Test Product | This function covers the physical and functional integration of the design. Also manages the tests and trials required to prove the design. |
| 09.1.3 Qualification & Certification | This function is responsible for managing the qualification & certification of a design |
| 09.1.4 Acceptance | The function of proving that the design is fit for purpose by involving the end user in acceptance trials. |
The analysis and redesign of an asset and support solution based on performance and event feedback to maintain the desired capability.
LCIA
5A4F462C79224C7083507D8067B95FEF
738A662ECAD145519E79B128C1B28D29
Inputs
-
Actual Maintenance Costs
-
Approval to Develop a Design Change
-
Asset Capability Upgrades Required
-
Asset Details
-
Asset Status
-
Asset Utilisation
-
Authority to Use Design
-
Budget
-
Budget Forecast
-
Business Objectives
-
Change Audit Task
-
Change Impact Assessment
-
Change Record
-
Change Validation Task
-
Class Of Change
-
Codification Policy
-
Competencies Shortfall
-
Concept of Use
-
Concession Authority
-
Concession Request
-
Configuration Structure
-
Cost of ownership
-
Cost of support
-
Current Supplier
-
Deployment Environment
-
Design Change Request
-
Design Intent
-
Efficiency & Effectiveness Data
-
Environment Management Responses
-
Environmental Case
-
Environmental Case (Functional)
-
Environmental Case (Impacted)
-
Environmental Case Impact
-
Environmental Impact
-
Environmental Policies
-
Fault Detail
-
Functional Obsolescence Notice
-
Higher Intent
-
HR Constraints
-
HR Policy
-
HSE Policy
-
Impact Assessment Instruction
-
Implementation Task
-
Incident Investigation Report
-
Industrial Strategies
-
Infrastructure Constraints
-
Infrastructure Policy
-
Infrastruture Shortfall
-
Initial Provision
-
ITEA
-
Justification for HR Shortfall
-
Justification for infrastructure shortfall
-
Legislation
-
Maintenance Capability Available
-
Maintenance Feedback
-
Maintenance Task Status
-
Obsolescence Plan
-
Obsolescence Risk (Status)
-
Obsolescence Risk Details
-
Operating Limitation imposed by Defect
-
Operating Limitation imposed by Design
-
Peformance Data Requirement
-
Performance and Usage Data
-
Predicted Asset Usage
-
Preliminary Change Assessment
-
Product Baseline
-
Product Design
-
Product Design Constraints
-
Product Design Cost
-
Product Design Issues
-
Product Structure
-
Qualification & Certification Results
-
Release Instruction
-
Request for Investigation (Issues)
-
Request for Investigation (Obsolescence)
-
Request for technical approval
-
Risk Assessment
-
Safety Case
-
Safety Case (Functional)
-
Safety Case (Impacted)
-
Safety Case impact
-
Safety Impact
-
Safety Management Responses
-
Safety Policies
-
Scale Recommended
-
Standards Policy
-
Support Capability Requirement
-
Support Solution Constraints
-
Support Solution Design
-
Support Solution Design Change Request
-
Support Solution Issues
-
Support Solution Option Cost
-
Sustainment Tasks Feedback
-
Technical Obsolescence Notice
-
Technical Regulatory Framework for Environment
-
Technical Regulatory Framework for Safety
-
Technology Insertion Opportunity
-
Technology Update
-
Test Data
-
Test Results
-
TLMP
-
Training Needs Analysis Report
-
Training Options Report
-
VFM comparator / target
Outputs
-
Acceptance against Contract
-
Actual Performance Data
-
Analysed Efficiency and Effectiveness Data
-
Asset Conditions of Use
-
Asset Details
-
Asset First Use Date
-
Asset Permissable Configuration
-
Authority to Use Asset
-
Certification to Use Asset
-
Change Audit Task
-
Change Validation Task
-
Codification Requirement
-
Competence Framework
-
Concession Approval Status
-
Concession Authority
-
Cost of support
-
Design Change Impact
-
Design Change Request
-
Design Costs
-
Design Intent
-
Design Intent Change Recommendations
-
Design Usage Profile
-
Disposal Method
-
Disposal Policy
-
Engineering Risk Status
-
Environment Management Responses
-
Environmental Assessment
-
Environmental Case
-
Environmental Case (Impacted)
-
Environmental Case Impact
-
Environmental Considerations
-
Environmental Impact
-
Failure Performance Information
-
Hazard Information
-
HR Requirements
-
Impact of failure
-
Implementation Pack
-
Implementation Task
-
Infrastructure Requirements
-
ITEA
-
Item Range Recommended
-
Legal Impact
-
Locations for Stock
-
Maintenance Baseline
-
Maintenance Policy
-
Obsolescence Risk (Status)
-
Obsolescence Risk Details
-
Operating Limitation imposed by Defect
-
Operating Limitation imposed by Design
-
Predicted Asset Usage
-
Probability of obsolescence through technology
-
Product Baseline
-
Product Configuration Information
-
Product Design
-
Product Design Acceptance Details
-
Product Design Cost
-
Product Design Issues
-
Product Design Option
-
Product Structure
-
Product Support Baseline
-
Qualification & Certification Results
-
Safety Assessment
-
Safety Case
-
Safety Case (Impacted)
-
Safety Case impact
-
Safety Considerations
-
Safety Impact
-
Safety Management Responses
-
Scale Recommended
-
Stock Availability Target
-
Stock Sustainability Need
-
Storage Constraint
-
Supercession Need
-
Support Solution Acceptance Details
-
Support Solution Design
-
Support Solution Design Change Request
-
Support Solution Issues
-
Support Solution Option
-
Support Solution Options
-
Technical approval
-
Technical approval denied
-
Test Data
-
Test Results
-
TLMP
-
Training Course Requirements
-
Training Needs Analysis Scope
-
Training Requirements
-
Whole life cost
Incoming
Outgoing
-
06 - 10.1
-
09 - *10.2.5.1
-
09 - *10.2.1
-
09 - *10.2.3
-
09 - *10.2.3.1
-
09 - *10.2.3.3
-
09 - *10.2.3.4
-
09 - *10.2.3.6
-
09 - *10.2.5
-
09 - *10.2.5.2
-
09 - *10.2.5.5
-
09 - 02
-
09 - 03
-
09 - 03.1.2.1
-
09 - 03.2
-
09 - 03.3.1.2
-
09 - 03.4.5
-
09 - 06
-
09 - 06.2.1
-
09 - 07
-
09 - 08
-
09 - 08
-
09 - 10
-
09 - 10
-
09 - 10.1
-
09 - 10.2
-
09 - 10.3
-
09 - 10.5
-
09 - 10.5.4
-
09 - 10.5.5
-
09 - 10.6
-
09 - 10.6.1
-
09 - 10.6.2
-
09 - 10.6.3
-
09 - 11
-
09 - BS
-
09 - E
-
09 0 11.3.2
-
Help with an Aggregate Model Navigation View model
-
Navigation Matrix Navigation View model
-
Problem, Change (7), Training (8) and Engineering (9) Navigation View model
-
01. Strategy and Planning Activity Model
-
02. Mission / Operation Activity Model
-
03. Fleet and Asset Activity Insight Model
-
03. Fleet and Asset Activity Model
-
03.1 Structure Fleet Activity Model
-
03.1.2 Define Fleet Support Structures Activity Model
-
03.2 Establish fleet Activity Model
-
03.3.1 Initiate Support Structure Change Activity Model
-
03.4 Sustain Assets Activity Model
-
03.5 Allocate Assets to Task Activity Model
-
06. Configuration Activity Insight Model
-
06. Configuration Activity Model
-
06.1 Manage Configuration Baseline Activity Model
-
06.1.2 Specify Configuration Activity Model
Equipment and Support Solution Design
Level 0