Thursday, February 07, 2008

Ancestry : LCIA Version 3.5 : DELIVER LOGISTIC SUPPORT : CONFIGURE : 06. Configuration : 06.2 Manage Configuration Change

The page is loading. Please wait...

If you continue to see this message then either your browser has blocked active content or JavaScript is disabled or not supported on your browser. If you browser has blocked active content then you will need to "Allow Blocked Content..." from the bar at the top of this window.

 

Change RecordClass Of Change09.2 Design Support SolutionProduct Design09.1.1 Design Physical ProductChange RecordClass Of ChangePreliminary Change RecordStatus Of Change Task06.2.2.1  Perform preliminary assessmentDesign Change RequestSupport Asset Upgrade Requirement03.1.2.2 Plan Development of Structures and ResourcesPreliminary Change Assessment06.2.2.1  Perform preliminary assessmentChange RecordChange RecordChange RecordChange RecordChange Status NotificationClass Of ChangeImpact Assessment InstructionStatus Of Change Task06.2.3.3 Compile business justification06.2.3.2 Cost solution option06.2.3.1 Assess solution option risksDesign Change Request07.1 Event ManagementCONFIGUREHelp with a Flow Model06.2.2.2  Perform impact assessmentAuthority to Use DesignChange to BaselineRelease Instruction06.1.3.2 Release baselineApproval to Develop a Design ChangeAuthority to develop a support solution design change06.2.3.4 Authorise change to be designedChange RecordClass Of ChangeChange Status NotificationModification NotificationChange Status NotificationModification NotificationChange Status NotificationModification NotificationChange Status NotificationChange Status Notification09.1.1 Design Physical Product03.4.4 Monitor and Control Sustainment Tasks03.3.2 Monitor and Control Fleet Support Structure Change03.2.2 Monitor and Control Fleet Composition Change03.2.1 Initiate Fleet Composition Change07.1 Event ManagementConfiguration StructureMaintenance FeedbackDesign Change RequestSustainment Tasks FeedbackDesign Change RequestUpdate TasksAsset Capability Upgrades RequiredDesign Change Request03.4.4 Monitor and Control Sustainment Tasks11.3.3 Report Maintenance09.3 Design Intent03.4.1 Identify Sustainment Tasks03.1.1 Define Fleet CompositionLCIA Version 3.506.2 Manage Configuration Change06.2.1 Administer Change06.2.1 Administer Change
This process organizes the product configuration information and makes it available, as required, to support all programme activities such as systems engineering, manufacturing, hardware and software development and production, logistic support, modification, and disposal
  • LCIA

8676ED32434545BF810B2C821FAF75A7

738A662ECAD145519E79B128C1B28D29