LCIA
418F2B464E0C4ABA94E4A1315F1188CE
738A662ECAD145519E79B128C1B28D29
Inputs
-
Actual Maintenance Costs
-
Approval to Develop a Design Change
-
Asset Capability Upgrades Required
-
Asset Details
-
Asset Status
-
Asset Utilisation
-
Authority to Use Design
-
Budget
-
Budget Forecast
-
Business Objectives
-
Change Audit Task
-
Change Impact Assessment
-
Change Record
-
Change Validation Task
-
Class Of Change
-
Codification Policy
-
Competencies Shortfall
-
Concept of Use
-
Concession Authority
-
Concession Request
-
Configuration Structure
-
Cost of ownership
-
Cost of support
-
Current Supplier
-
Deployment Environment
-
Design Change Request
-
Design Intent
-
Efficiency & Effectiveness Data
-
Environment Management Responses
-
Environmental Case
-
Environmental Case (Functional)
-
Environmental Case (Impacted)
-
Environmental Case Impact
-
Environmental Impact
-
Environmental Policies
-
Fault Detail
-
Functional Obsolescence Notice
-
Higher Intent
-
HR Constraints
-
HR Policy
-
HSE Policy
-
Impact Assessment Instruction
-
Implementation Task
-
Incident Investigation Report
-
Industrial Strategies
-
Infrastructure Constraints
-
Infrastructure Policy
-
Infrastruture Shortfall
-
Initial Provision
-
ITEA
-
Justification for HR Shortfall
-
Justification for infrastructure shortfall
-
Legislation
-
Maintenance Capability Available
-
Maintenance Feedback
-
Maintenance Task Status
-
Obsolescence Plan
-
Obsolescence Risk (Status)
-
Obsolescence Risk Details
-
Operating Limitation imposed by Defect
-
Operating Limitation imposed by Design
-
Peformance Data Requirement
-
Performance and Usage Data
-
Predicted Asset Usage
-
Preliminary Change Assessment
-
Product Baseline
-
Product Design
-
Product Design Constraints
-
Product Design Cost
-
Product Design Issues
-
Product Structure
-
Qualification & Certification Results
-
Release Instruction
-
Request for Investigation (Issues)
-
Request for Investigation (Obsolescence)
-
Request for technical approval
-
Risk Assessment
-
Safety Case
-
Safety Case (Functional)
-
Safety Case (Impacted)
-
Safety Case impact
-
Safety Impact
-
Safety Management Responses
-
Safety Policies
-
Scale Recommended
-
Standards Policy
-
Support Capability Requirement
-
Support Solution Constraints
-
Support Solution Design
-
Support Solution Design Change Request
-
Support Solution Issues
-
Support Solution Option Cost
-
Sustainment Tasks Feedback
-
Technical Obsolescence Notice
-
Technical Regulatory Framework for Environment
-
Technical Regulatory Framework for Safety
-
Technology Insertion Opportunity
-
Technology Update
-
Test Data
-
Test Results
-
TLMP
-
Training Needs Analysis Report
-
Training Options Report
-
VFM comparator / target
Outputs
-
Acceptance against Contract
-
Actual Performance Data
-
Analysed Efficiency and Effectiveness Data
-
Asset Conditions of Use
-
Asset Details
-
Asset First Use Date
-
Asset Permissable Configuration
-
Authority to Use Asset
-
Certification to Use Asset
-
Change Audit Task
-
Change Validation Task
-
Codification Requirement
-
Competence Framework
-
Concession Approval Status
-
Concession Authority
-
Cost of support
-
Design Change Impact
-
Design Change Request
-
Design Costs
-
Design Intent
-
Design Intent Change Recommendations
-
Design Usage Profile
-
Disposal Method
-
Disposal Policy
-
Engineering Risk Status
-
Environment Management Responses
-
Environmental Assessment
-
Environmental Case
-
Environmental Case (Impacted)
-
Environmental Case Impact
-
Environmental Considerations
-
Environmental Impact
-
Failure Performance Information
-
Hazard Information
-
HR Requirements
-
Impact of failure
-
Implementation Pack
-
Implementation Task
-
Infrastructure Requirements
-
ITEA
-
Item Range Recommended
-
Legal Impact
-
Locations for Stock
-
Maintenance Baseline
-
Maintenance Policy
-
Obsolescence Risk (Status)
-
Obsolescence Risk Details
-
Operating Limitation imposed by Defect
-
Operating Limitation imposed by Design
-
Predicted Asset Usage
-
Probability of obsolescence through technology
-
Product Baseline
-
Product Configuration Information
-
Product Design
-
Product Design Acceptance Details
-
Product Design Cost
-
Product Design Issues
-
Product Design Option
-
Product Structure
-
Product Support Baseline
-
Qualification & Certification Results
-
Safety Assessment
-
Safety Case
-
Safety Case (Impacted)
-
Safety Case impact
-
Safety Considerations
-
Safety Impact
-
Safety Management Responses
-
Scale Recommended
-
Stock Availability Target
-
Stock Sustainability Need
-
Storage Constraint
-
Supercession Need
-
Support Solution Acceptance Details
-
Support Solution Design
-
Support Solution Design Change Request
-
Support Solution Issues
-
Support Solution Option
-
Support Solution Options
-
Technical approval
-
Technical approval denied
-
Test Data
-
Test Results
-
TLMP
-
Training Course Requirements
-
Training Needs Analysis Scope
-
Training Requirements
-
Whole life cost
-
09. Engineering Activity Model
-
09.1 Design Product Activity Model
-
09.1.1 Design Physical Product Activity Insight Model
-
09.1.2 Integrate & Test Product Activity Insight Model
-
09.1.3 Qualification & Certification Activity Insight Model
-
09.1.4 Acceptance Activity Insight Model
-
09.3 Design Intent Activity Insight Model
-
09.4 Manage Safety Activity Insight Model
-
09.5 Manage Environment Activity Insight Model
-
16. Performance and Risk Activity Model
-
DELIVER LOGISTIC SUPPORT Activity Model
-
ENGINEER Activity Model