
This function determines all maintenance activities to be performed for a selected scope of assets and planning horizon. Preventative maintenance will be driven by either calender or where it is utilisation based by the reported usage. Other maintenance will included planned modification embodiments, work identified and not completed during previous maintenance periods and corrective maintenance deferred for planning.
-
Availability: Deployed: MOD
-
Availability: Depth: Industry
-
Availability: Forward: Industry
-
Capability: Deployed: Industry
-
Capability: Depth: Industry
-
Capability: Forward: Industry
-
Spares Inclusive: Deployed: MOD
-
Spares Inclusive: Depth: MOD
-
Spares Inclusive: Forward: MOD
-
Traditional: Deployed: MOD
-
Traditional: Depth: MOD
-
Traditional: Forward: MOD
LCIA
A4548A58BB2C408891333DE664EC161E
738A662ECAD145519E79B128C1B28D29
Inputs
-
Asset Assignment Details
-
Asset Change Embodiment Schedule
-
Asset Condition
-
Asset Current Configuration
-
Asset Details
-
Asset Identifier(s)
-
Asset Status
-
Asset Usage Data
-
Assets available for assignment
-
Baseline Disposal Confirmation
-
Budget
-
Cannibalisation Instruction
-
Concession Authority
-
Configuration Structure
-
Contract Details
-
Fault Detail
-
Fault Notification
-
HR Policy
-
HR Procedures
-
HSE Policy
-
Infrastructure Policy
-
Initial Provision
-
Instruction to Inspect
-
Instruction to Maintain
-
Inventory Delivery Forecasts
-
Maintenance Plan
-
Maintenance Plan Execution Status
-
Maintenance Policy
-
Maintenance Programme
-
Maintenance Replan Request
-
Modification Embodiment Plan
-
Operating Limitation imposed by Defect
-
Pre-issue test task
-
Product Design
-
Repair Task
-
Stock Earmark Details
Outputs
Incoming
-
*10.2.3.1 - 11.1.1
-
*10.2.3.2- 11.1.1
-
*10.3.2 - 11.1.1
-
*10.6.1 - *11.1.1
-
*10.6.3 - *11.1.1
-
02.2 - 11.1.1
-
03.1.3 - 11.1.1
-
03.2.1 - 11.1.1
-
03.2.3 - 11.1.1
-
03.4.2 - 11.1.1
-
03.4.4 - 11.1.1
-
03.4.5 - 11.1.1
-
03.5.3 - 11.1.1
-
06 - 11.1.1
-
06.1.2.2 - 11.1.1
-
09.1.1 - 11.1.1
-
09.3 - 11.1.1
-
10 - 11.1.1
-
11.3.2 - 11.1.1
-
11.3.3 - 11.1.1
-
12.2.01 - 11.1.1
-
13.1 - 11.1.1
-
14.1 - 11.1.1
-
17.1 - 11.1.1
-
17.2 - 11.1.1
-
18.1 - 11.1.1
-
02.2 Operate Asset Activity Insight Model
-
03.1.3 Plan Upgrades Activity Insight Model
-
03.2.1 Initiate Fleet Composition Change Activity Insight Model
-
03.2.3 Audit Fleet Capability Activity Insight Model
-
03.4.2 Plan and Initiate Sustainment Tasks Activity Insight Model
-
03.4.4 Monitor and Control Sustainment Tasks Activity Insight Model
-
03.4.5 Audit asset Activity Insight Model
-
03.5.3 Allocate Asset to Task Activity Insight Model
-
06.1.2.2 Define configuration structure Activity Insight Model
-
09.1.1 Design Physical Product Activity Insight Model
-
09.3 Design Intent Activity Insight Model
-
10.2.3.1 Manage Initial Provision Activity Insight Model
-
10.2.3.2 Manage Replenishment Activity Insight Model
-
10.3.2 Manage Issue Activity Insight Model
-
10.6.1 Manage Packs and Assemblies Activity Insight Model
-
10.6.3 Manage Reconditioning / Repair Interface Activity Insight Model
-
11.1 Plan Maintenance Activity Model
-
11.1.1 Scope Maintenance Activity Insight Model
-
11.1.2 Structure Maintenance Activity Insight Model
-
11.3.2 Maintenance Exception Handling Activity Insight Model
-
11.3.3 Report Maintenance Activity Insight Model
-
12.2.01 Review extant arrangements Activity Insight Model
-
13.1 Human Resource Management Activity Insight Model
-
14.1 Corporate Governance Activity Insight Model
-
17.1 Planning budgeting and forecasting Activity Insight Model
-
17.2 Manage budgets in-year Activity Insight Model
-
17.4 Financial Accounting Activity Insight Model
-
18.1 Business Strategy Activity Insight Model
-
MAINTAIN Activity Model
Maintenance
Level 2
