Analyse the supportability of the design and / or re-design and influences the design. Once the design is finalised the optimised Support Solution will be derived looking at all elements required e.g. Training, Tech Pubs, Maintenance, facilities, tools etc
-
Availability: Depth: Industry
-
Capability: Depth: Industry
-
Spares Inclusive: Depth: Shared
-
Traditional: Depth: Shared
LCIA
58463D84939543F080E13CE893D396B8
738A662ECAD145519E79B128C1B28D29
Inputs
-
Approval to Develop a Design Change
-
Budget
-
Budget Forecast
-
Change Impact Assessment
-
Change Record
-
Class Of Change
-
Codification Policy
-
Competencies Shortfall
-
Concept of Use
-
Configuration Structure
-
Cost of ownership
-
Cost of support
-
Current Supplier
-
Deployment Environment
-
Design Change Request
-
Environmental Policies
-
Higher Intent
-
HR Constraints
-
HR Policy
-
Impact Assessment Instruction
-
Industrial Strategies
-
Infrastructure Constraints
-
Infrastructure Policy
-
Infrastruture Shortfall
-
Initial Provision
-
ITEA
-
Justification for HR Shortfall
-
Justification for infrastructure shortfall
-
Maintenance Capability Available
-
Preliminary Change Assessment
-
Product Baseline
-
Product Design
-
Product Structure
-
Release Instruction
-
Risk Assessment
-
Safety Policies
-
Scale Recommended
-
Support Solution Constraints
-
Support Solution Design Change Request
-
Support Solution Option Cost
-
Sustainment Tasks Feedback
-
Training Needs Analysis Report
-
Training Options Report
-
VFM comparator / target
Outputs
-
Asset First Use Date
-
Change Validation Task
-
Competence Framework
-
Cost of support
-
Disposal Method
-
Disposal Policy
-
HR Requirements
-
Infrastructure Requirements
-
ITEA
-
Item Range Recommended
-
Locations for Stock
-
Maintenance Baseline
-
Maintenance Policy
-
Obsolescence Risk Details
-
Product Configuration Information
-
Product Design
-
Product Support Baseline
-
Scale Recommended
-
Stock Availability Target
-
Stock Sustainability Need
-
Storage Constraint
-
Supercession Need
-
Support Solution Design
-
Support Solution Issues
-
Support Solution Option
-
Support Solution Options
-
TLMP
-
Training Course Requirements
-
Training Needs Analysis Scope
-
Training Requirements
-
Whole life cost
Incoming
-
01 - 09.2
-
02.1 - 09.2
-
03.1.2.2 - 09.2
-
03.4.1 - 09.2
-
06.1.2.1 - 09.2
-
06.1.2.2 - 09.2
-
06.1.3.1 - 09.2
-
06.1.3.2 - 09.2
-
06.2.1 - 09.2
-
06.2.2.1 - 09.2
-
06.2.2.2 - 09.2
-
06.2.3.1 - 09.2
-
06.2.3.2 - 09.2
-
06.2.3.4 - 09.2
-
06.2.3.5 - 09.2
-
08.1 - 09.2
-
09.1.1 - 09.2
-
09.1.2 - 09.2
-
09.3 - 09.2
-
10 - 09.2
-
10.2.1 - 09.2
-
10.2.3.1 - 09.2
-
13.1 - 09.2
-
13.2 - 09.2
-
17.1 - 09.2
-
18.1 - 09.2
-
18.2 - 09.2
Outgoing
-
09.2 - *10.2.3.4
-
09.2 - *10.2.3.5
-
09.2 - *10.2.5.1
-
09.2 - *10.2.5.2
-
09.2 - 03.1.2.1
-
09.2 - 03.1.3
-
09.2 - 03.3.1.2
-
09.2 - 03.4.1
-
09.2 - 03.4.2
-
09.2 - 06.1.4.1
-
09.2 - 06.1.5.3
-
09.2 - 06.2.2.1
-
09.2 - 06.2.2.2
-
09.2 - 06.2.3.1
-
09.2 - 06.2.3.2
-
09.2 - 08.1
-
09.2 - 09.1.1
-
09.2 - 09.1.2.2
-
09.2 - 09.3
-
09.2 - 09.4
-
09.2 - 09.5
-
09.2 - 10
-
09.2 - 10.1.1
-
09.2 - 10.1.2
-
09.2 - 10.1.3
-
09.2 - 10.2.1
-
09.2 - 10.2.3.1
-
09.2 - 10.6.3
-
09.2 - 13.1
-
09.2 - 13.2
-
09.2 - 15
-
09.2 - 16.3
-
09.2 - 17.1
-
01. Strategy and Planning Activity Insight Model
-
02.1 Ops Planning and Control Activity Insight Model
-
03.1.2.1 Determine Requirements and Context Activity Insight Model
-
03.1.2.2 Plan Development of Structures and Resources Activity Insight Model
-
03.1.3 Plan Upgrades Activity Insight Model
-
03.3.1.2 Plan Acquisition and Deployment Activity Insight Model
-
03.4.1 Identify Sustainment Tasks Activity Insight Model
-
03.4.2 Plan and Initiate Sustainment Tasks Activity Insight Model
-
06.1.2.1 Specify generic structure Activity Insight Model
-
06.1.2.2 Define configuration structure Activity Insight Model
-
06.1.3.1 Establish / Update baseline Activity Insight Model
-
06.1.3.2 Release baseline Activity Insight Model
-
06.1.4.1 Scope configuration Verification Activity Insight Model
-
06.1.5 Perform Configuration Audit Activity Model
-
06.1.5.3 Execute configuration audit Activity Insight Model
-
06.2.1 Administer Change Activity Insight Model
-
06.2.2.1 Perform preliminary assessment Activity Insight Model
-
06.2.2.2 Perform impact assessment Activity Insight Model
-
06.2.3.1 Assess solution option risks Activity Insight Model
-
06.2.3.2 Cost solution option Activity Insight Model
-
06.2.3.4 Authorise change to be designed Activity Insight Model
-
06.2.3.5 Authorise change to be implemented Activity Insight Model
-
08.1 Identify Training Activity Insight Model
-
09. Engineering Activity Model
-
09.1 Design Product Activity Model
-
09.1.1 Design Physical Product Activity Insight Model
-
09.1.2 Integrate & Test Product Activity Insight Model
-
09.2 Design Support Solution Activity Insight Model
-
09.3 Design Intent Activity Insight Model
-
09.4 Manage Safety Activity Insight Model
-
09.5 Manage Environment Activity Insight Model
-
10.1.1 Develop long term supply plan Activity Insight Model
-
10.1.2 Plan core supply capability Activity Insight Model
-
10.1.3 Plan supply operations Activity Insight Model
-
10.2.1 Develop inventory policy Activity Insight Model
-
10.2.3.1 Manage Initial Provision Activity Insight Model
-
10.2.3.4 Manage Obsolescence Activity Insight Model
-
10.2.3.5 Manage Supersession Activity Insight Model
-
10.2.5.1 Range Inventory Activity Insight Model
-
10.2.5.2 Scale Inventory Activity Insight Model
-
10.6.3 Manage Reconditioning / Repair Interface Activity Insight Model
-
13.1 Human Resource Management Activity Insight Model
-
13.2 Infrastructure Resource Management Activity Insight Model
-
15. Manufacture / Source Activity Insight Model
-
16.3 Business Modelling and Analysis Activity Insight Model
-
17.1 Planning budgeting and forecasting Activity Insight Model
-
18.1 Business Strategy Activity Insight Model
-
18.2 Business Planning Activity Insight Model
-
ENGINEER Activity Model
C.2 Initial Design
Level 1