Thursday, February 07, 2008

Ancestry : LCIA Version 3.5 : MISSION / OPERATE : 02. Mission / Operation

The page is loading. Please wait...

If you continue to see this message then either your browser has blocked active content or JavaScript is disabled or not supported on your browser. If you browser has blocked active content then you will need to "Allow Blocked Content..." from the bar at the top of this window.

 

Functional Obsolescence NoticeObsolescence PlanTechnical Obsolescence Notice10.2.3.4 Manage ObsolescenceInitial Provision10.2.3.1 Manage Initial ProvisionStorage Site Location10.2.3.1 Manage Initial ProvisionIncident Investigation ReportDeployment EnvironmentSupport Solution Constraints 09.3 Design Intent09.2 Design Support SolutionScale Prescribed10.2.5.2 Scale InventoryItem Range10.2.5.1 Range InventoryConcept of UseOperational Scenario08.1 Identify TrainingDeployment EnvironmentOperational PlansSupport Solution Constraints 03.3.1.2 Plan Acquisition and Deployment03.1.2.1 Determine Requirements and ContextDeployment RequirementsOperational Plans10.6.1 Manage Packs and AssembliesOperational RequirementDeployment RequirementsOperational PlansOperational RequirementSurge RequirementsOperational PlansOperational RequirementSurge RequirementsMovement TaskOperational PlansAccept Movement Schedule10.4.2 Schedule movement10.4.1 Plan movement10.2.2 Forecast demand10.1.3 Plan supply operations10.1.2 Plan core supply capability10.1.1 Develop long term supply planCurrent operational supply capabilityForecast Operational Supply CapabilityOperational Supply PlanAsset Identifier(s)Inventory Delivery ForecastsItem Not Available StatementStock HoldingStorage Site LocationMovement OptionsMovement PlanMovement Schedule Demand Details10.3.1 Find Stock Solution10.4.2 Schedule movement10.4.1 Plan movement10.3.1 Find Stock Solution10.1.3 Plan supply operationsActual Performance Data16.2 Performance  MonitoringPeformance Data Requirement16.1 Metric IdentificationHelp with a Flow ModelMISSION / OPERATEOperational Task Priority03.5.3 Allocate Asset to TaskTransfer Asset Feedback03.4.4 Monitor and Control Sustainment TasksIncident Investigation Report03.5.2 Match Assets to Op TaskTransfer Asset Instruction03.2.1 Initiate Fleet Composition ChangeAsset Assignment Details Transfer Asset Instruction03.4.2 Plan and Initiate Sustainment TasksOperational TaskAsset Assignment Details Authority to Use AssetTasks Without AllocationDeployment RequirementsOperational Plans03.1.1 Define Fleet Composition03.5.3 Allocate Asset to Task03.5.1 Identify Task RequirementsLCIA Version 3.502. Mission / OperationOperational PlansOperational TaskOperational Task Priority02.2 Operate AssetOperational ScenarioPlanning AssumptionsConcept of UseEnvironmental PoliciesHigher IntentHSE PolicyMovement PoliciesOperating Policy18.2 Business Planning 18.1 Business Strategy Higher Intent01. Strategy and PlanningIncident NotificationMission Report02.2 Operate Asset02.1 Ops Planning and Control02.1 Ops Planning and Control
This function plans operations/missions in accordance with operational objectives/directives and tasks accordingly based on allocated assets. Control of the mission/operation is performed based on feedback from operators and operating assets.
  • LCIA

B5A9989E9BC1423DAC3DFFD03A9358C9

738A662ECAD145519E79B128C1B28D29