| L: Explanation of Function | |
| 11. Maintenance | |
| 11.1 Plan Maintenance | To plan all maintenance identifiable at that date: Looking at the resource and asset availability and grouping the maintenance logically. Then scheduling the tasks in accordance with operational and maintenance cycle and resource availability. |
| 11.2 Execute Maintenance | This function produces short term / resourced work schedules based on the long term maintenance plan, factors in unplanned maintenance requirements and priorities, and controls the production and issue and closure of Maintenance Work Orders. |
| 11.3 Monitor & Control Maintenance | This function manages the maintenance function performance, reviewing performance against schedules and providing feedback in terms of revised targets. It also initiates corrective action to achieve maintenance targets. |
| 11.1 Plan Maintenance | |
| 11.1.1 Scope Maintenance | This function determines all maintenance activities to be performed for a selected scope of assets and planning horizon. Preventative maintenance will be driven by either calender or where it is utilisation based by the reported usage. Other maintenance will included planned modification embodiments, work identified and not completed during previous maintenance periods and corrective maintenance deferred for planning. |
| 11.1.2 Structure Maintenance | This function considers priorities and the logical progression of maintenance tasks and adds a potential sequence to their delivery. |
| 11.1.3 Schedule Maintenance | This function produces the maintenance plan by considering the prioritised task list adds a sequence and date to all tasks allocated to a specific maintenance opportunity, related tasks(incl. triggers), location, materiel availability, resource requirements and resource balancing considerations. |
| 11.2 Execute Maintenance | |
| 11.2.1 Allocate Maintenance Task | This function allocates specific assets to particular manitenance activities, applying the requirements of the Maintenance Plan and particular human & infrastructure resources. |
| 11.2.2 Perform Maintenance Task | This function carries out the actual maintenance activity in accordance with a work order and the policies & documentation laid out in the Support Solution. |
| 11.2.3 Close Maintenance Task | This function closes out the maintenance task and provides post maintenance feedback on the asset and the resources comsumed. |
| 11.3 Monitor & Control Maintenance | |
| 11.3.1 Task Assurance | This activity monitors the quality of tasks executed against quality standards and contractual specifications. |
| 11.3.2 Maintenance Exception Handling | This activity monitors all tasks and actions all delays, defers, non-conformances and emergent work, by re-scheduling where appropriate and obtaining approvals (incl concessions) where required. |
| 11.3.3 Report Maintenance | This activity collate all feedback against tasks, assets and resources/material for a given selection (maintenance opportunity/ asset/ time) and presents the information in a prescribed format. |
Maintenance is the inspection, overhaul, repair , rectification, modification, preservation and parts replacement, to ensure that the equipment is kept in a serviceable condition.
It covers all scheduled and non-scheduled events, preventative and non-preventative activities, including repair, servicing, overhaul, upgrade to an item in accordance with direction.
LCIA
FEA7F999E82D4AD58497978B07F7A6CE
738A662ECAD145519E79B128C1B28D29
Inputs
-
Asset Assignment Details
-
Asset Change Embodiment Schedule
-
Asset Condition
-
Asset Current Configuration
-
Asset Details
-
Asset Identifier(s)
-
Asset Status
-
Asset Usage Data
-
Assets available for assignment
-
Authority to Use Design
-
Baseline Disposal Confirmation
-
Budget
-
Cannibalisation Instruction
-
Concession Approval Status
-
Concession Authority
-
Configuration Structure
-
Contract Assurance Task
-
Contract Details
-
Demand Referrals
-
Disposal Task
-
Exception Resolution Assessment
-
Fault Detail
-
Fault Notification
-
HR Availability
-
HR Policy
-
HR Procedures
-
HR resources released
-
HR Utilisation Data
-
HSE Policy
-
Implementation Pack
-
Infrastructure Availability
-
Infrastructure Policy
-
Infrastructure resource released
-
Infrastructure Utilisation Data
-
Initial Provision
-
Instruction to Inspect
-
Instruction to Maintain
-
Inventory Delivery Forecasts
-
Item Not Available Statement
-
Maintenance Issues
-
Maintenance Lessons Identified
-
Maintenance Plan
-
Maintenance Plan Execution Status
-
Maintenance Policy
-
Maintenance Programme
-
Maintenance Replan Request
-
Maintenance Task Exception Statement
-
Maintenance Task List
-
Maintenance Task Non Conformance Detail
-
Maintenance Task Sequence
-
Maintenance Task Status
-
Modification Embodiment Plan
-
Operating Limitation imposed by Defect
-
Peformance Data Requirement
-
Pre-issue test task
-
Product Baseline
-
Product Design
-
Repair Task
-
Rework Instruction
-
Standards Policy
-
Stock Earmark Details
-
Work Orders
Outputs
-
Actual Maintenance Costs
-
Actual Performance Data
-
Advance Notice to Supplier of Item for Repair
-
Asset Current Configuration
-
Asset Fitment Details
-
Asset Identifier(s)
-
Asset Release
-
Asset Status
-
Asset Sustainment Operation Request
-
Asset Usage Data
-
Concession Request
-
Conditioning Decision
-
Configuration Structure
-
Contract Assurance Approval
-
Contract Assurance Task
-
Cost to maintain
-
Demand Details
-
Demand Details
-
Disposal Task
-
Fault Detail
-
Fault Notification
-
Fleet Maintenance Reprogramme Request
-
Forecast of Outturn
-
HR Requirements
-
HR resources released
-
HR Utilisation Data
-
Infrastructure Requirements
-
Infrastructure resource released
-
Infrastructure Utilisation Data
-
Infrastructure utilisation data
-
Item Condition
-
Item Consumption Details
-
Maintenance Feedback
-
Maintenance Issues
-
Maintenance Lessons Identified
-
Maintenance Plan
-
Maintenance Plan Execution Status
-
Maintenance Replan Request
-
Maintenance Report
-
Maintenance Task Exception Statement
-
Maintenance Task List
-
Maintenance Task Non Conformance Detail
-
Maintenance Task Sequence
-
Maintenance Task Status
-
Operating Limitation imposed by Defect
-
Performance and Usage Data
-
Purchase Request
-
Referral Requirement
-
Request Purchase Status
-
Rework Instruction
-
Spares Kitting Requirement
-
Supercession Need
-
Work Orders
Incoming
Outgoing
-
02. Mission / Operation Activity Insight Model
-
02. Mission / Operation Activity Model
-
03. Fleet and Asset Activity Insight Model
-
03. Fleet and Asset Activity Model
-
03.1 Structure Fleet Activity Model
-
03.2 Establish fleet Activity Model
-
03.3 Establish Fleet Support Structure Activity Model
-
03.4 Sustain Assets Activity Model
-
03.5 Allocate Assets to Task Activity Model
-
06. Configuration Activity Model
-
06. Configuration Activity Insight Model
-
06.1 Manage Configuration Baseline Activity Model
-
06.1.2 Specify Configuration Activity Model
-
06.1.3 Manage Baseline Activity Model
-
06.2 Manage Configuration Change Activity Model
-
07. Event Activity Insight Model
-
07. Event Activity Model
-
08. Training Activity Insight Model
-
08. Training Activity Model
-
09. Engineering Activity Insight Model
-
09. Engineering Activity Model
-
10 Supply Activity Model
-
10.2 Manage Inventory Activity Model
-
10.2.3 Control Inventory Activity Model
-
10.3 Manage demands and returns Activity Model
-
10.5 Manage Stock Holding Point Activity Activity Model
-
10.6 Manage Stored Items Activity Model
-
11. Maintenance Activity Insight Model
-
11. Maintenance Activity Model
-
11.1 Plan Maintenance Activity Model
-
11.2 Execute Maintenance Activity Model
-
11.3 Monitor & Control Maintenance Activity Model
-
12. Commercial Activity Insight Model
-
12. Commercial Activity Model
-
12.2 Conduct Sourcing Activity Model
-
12.3 Manage Contract and Evaluate Activity Model
-
13. Resources Activity Model
-
13. Resources Activity Insight Model
-
14. Corporate Policy and Procedures Activity Model
-
14. Corporate Policy and Procedures Activity Insight Model
-
15. Manufacture / Source Activity Model
-
17. Finance Activity Model
-
17. Finance Activity Insight Model
-
18. Strategy and Planning Activity Model
-
18. Strategy and Planning Activity Insight Model
-
19. Purchasing Activity Model
-
19. Purchasing Activity Insight Model
-
LCIA Version 3.5 Activity Model
-
MAINTAIN Activity Model
Maintenance
Level 0
*10.2.3 - 11