This process executes the verification activities specified by the verification plan in accordance with programme procedures detailed in the CMP
NOTE - Once the initial configuration of a CI or system has been verified, changes to that configuration must be authorised through the configuration change management process.If the change is being introduced to a production line and all future products will have the change incorporated via the production process, it is sufficient to ensure that: manufacturing instructions contain the change and are released for use; the first articles produced are inspected for compliance (First Article Verification ; FAV).
If support processes are impacted or the change requires retrofit,implementation and verification of the change can be a lengthy process. Implementation planning will define the extent to which the change to each item and support process is to be verified and recorded
-
Availability: Depth: Industry
-
Capability: Depth: Industry
-
Spares Inclusive: Depth: MOD
-
Traditional: Depth: MOD
LCIA
49FA59AEA2DB429DAC80366300D35300
738A662ECAD145519E79B128C1B28D29
Inputs
Outputs
Incoming
Outgoing
-
03.4.5 Audit asset Activity Insight Model
-
06.1.2.1 Specify generic structure Activity Insight Model
-
06.1.2.2 Define configuration structure Activity Insight Model
-
06.1.2.3 Define configuration identifiers Activity Insight Model
-
06.1.4 Perform Configuration Verification Activity Model
-
06.1.4.2 Plan configuration Verification Activity Insight Model
-
06.1.4.3 Execute configuration Verification Activity Insight Model
-
06.1.4.4 Evaluate configuration Verification Activity Insight Model
-
09.1.1 Design Physical Product Activity Insight Model
-
CONFIGURE Activity Model
C.1 Sustain Design
Level 3
Asset Details