Action to assess the risks associated with a quantified solution to a valid need for change
-
Availability: Depth: Industry
-
Capability: Depth: Industry
-
Spares Inclusive: Depth: MOD
-
Traditional: Depth: MOD
LCIA
B7CE50AFF66F4DBEBC9AD488BBB6F51D
738A662ECAD145519E79B128C1B28D29
Inputs
Incoming
Outgoing
-
06.2.1 Administer Change Activity Insight Model
-
06.2.2.2 Perform impact assessment Activity Insight Model
-
06.2.3 Authorise Change Activity Model
-
06.2.3.1 Assess solution option risks Activity Insight Model
-
06.2.3.2 Cost solution option Activity Insight Model
-
09.1.1 Design Physical Product Activity Insight Model
-
09.1.4 Acceptance Activity Insight Model
-
09.2 Design Support Solution Activity Insight Model
-
09.4 Manage Safety Activity Insight Model
-
09.5 Manage Environment Activity Insight Model
-
CONFIGURE Activity Model
C.1 Sustain Design
Level 3
Change Audit Task
06.2.1 - 06.2.3.1