
Action to establish which members of the Product breakdown structure are to be changed, including new production and existing products.
LCIA
A3175CC489674C84B10746FD9B5E25C5
738A662ECAD145519E79B128C1B28D29
Inputs
-
Approval to Release Design
-
Asset Details
-
Asset Upgrade Plan
-
Audit Result
-
Audit Scope
-
Baseline Disposal Confirmation
-
Change Audit Plan
-
Change Audit Task
-
Change Status Notification
-
Change Validation Task
-
Change Verification Plan
-
CM Procedure
-
Configuration Item Details
-
Configuration Management Plan
-
Configuration Management Policy
-
Configuration Structure
-
Configured Item
-
Modification Embodiment Plan
-
Product Baseline
-
Product Configuration Information
-
Product Design
-
Product Design Acceptance Details
-
Product Structure
-
Product Support Baseline
-
Qualification & Certification Results
-
Support Asset Change Embodiment Plan
-
Support Asset Upgrade Plan
-
Support Solution Acceptance Details
-
Verification Result
-
Verification Scope
Outputs
-
Approval to Release Design
-
Audit Evaluation
-
Audit Result
-
Audit Scope
-
Authority to Use Design
-
Change Audit Plan
-
Change to Baseline
-
Change Verification Plan
-
CM Toolset Specification
-
Configuration Item Details
-
Configuration Management Plan
-
Configuration Structure
-
Configured Item
-
HR Requirements
-
Infrastructure Requirements
-
Product Baseline
-
Product Structure
-
Release Instruction
-
Verification Evaluation
-
Verification Result
-
Verification Scope
Outgoing
-
06. Configuration Activity Model
-
06.1 Manage Configuration Baseline Activity Model
-
06.1.1 Manage Configuration Plans Activity Insight Model
-
06.1.2 Specify Configuration Activity Model
-
06.1.3 Manage Baseline Activity Model
-
06.1.4 Perform Configuration Verification Activity Model
-
06.1.5 Perform Configuration Audit Activity Model
-
06.2 Manage Configuration Change Activity Model
-
CONFIGURE Activity Model
C.1 Sustain Design
Level 1
06.1 - 06.2.1