
Activity to ensure that the design objectives are reached / maintained efficiently by the asset. Including analysis (DRACAS), performance and authorisation of all events (Concession, limitations, faults, obsolescence etc) that impacts conformance to the design.
-
Availability: Deployed: Shared
-
Availability: Depth: Industry
-
Availability: Forward: Industry
-
Capability: Deployed: Industry
-
Capability: Depth: Industry
-
Capability: Forward: Industry
-
Spares Inclusive: Deployed: Shared
-
Spares Inclusive: Depth: Shared
-
Spares Inclusive: Forward: Shared
-
Traditional: Deployed: Shared
-
Traditional: Depth: Shared
-
Traditional: Forward: Shared
LCIA
82511CD122A343FFAC7F21267958C487
738A662ECAD145519E79B128C1B28D29
Inputs
-
Actual Maintenance Costs
-
Asset Details
-
Asset Utilisation
-
Concept of Use
-
Concession Request
-
Design Change Request
-
Design Intent
-
Efficiency & Effectiveness Data
-
Environmental Impact
-
Fault Detail
-
Incident Investigation Report
-
Legislation
-
Obsolescence Risk Details
-
Performance and Usage Data
-
Predicted Asset Usage
-
Product Design Constraints
-
Request for Investigation (Issues)
-
Request for Investigation (Obsolescence)
-
Request for technical approval
-
Safety Impact
-
Support Capability Requirement
-
Technical Regulatory Framework for Environment
-
Technical Regulatory Framework for Safety
-
Technology Insertion Opportunity
-
Technology Update
-
TLMP
Outputs
-
Analysed Efficiency and Effectiveness Data
-
Asset Conditions of Use
-
Asset Details
-
Asset Permissable Configuration
-
Certification to Use Asset
-
Concession Approval Status
-
Concession Authority
-
Design Change Impact
-
Design Change Request
-
Design Intent
-
Design Intent Change Recommendations
-
Design Usage Profile
-
Engineering Risk Status
-
Failure Performance Information
-
Impact of failure
-
Legal Impact
-
Obsolescence Risk (Status)
-
Obsolescence Risk Details
-
Operating Limitation imposed by Defect
-
Operating Limitation imposed by Design
-
Predicted Asset Usage
-
Probability of obsolescence through technology
-
Product Design
-
Stock Sustainability Need
-
Support Solution Design Change Request
-
Technical approval
-
Technical approval denied
Incoming
-
*10.2.3.6 - 09.3
-
*10.6.1 - 09.3
-
*10.6.2 - 09.3
-
02.1 - 09.3
-
02.2 - 09.3
-
03.1.1 - 09.3
-
03.1.2.2 - 09.3
-
03.2.3 - 09.3
-
03.4.1 - 09.3
-
03.4.5 - 09.3
-
03.5.3 - 09.3
-
07.1 - 09.3
-
09.2 - 09.3
-
09.4 - 09.3
-
09.5 - 09.3
-
10 - 09.3
-
11.2.2 - 09.3
-
11.3.2 - 09.3
-
11.3.3 - 09.3
-
14.1 - 09.3
-
15 - 09.3
-
18.1 - 09.3
-
19.2.2 - 09.3
Outgoing
-
09.3 - *10.2.3.4
-
09.3 - *10.2.3.6
-
09.3 - *10.6.1
-
09.3 - *10.6.2
-
09.3 - 03.1.1
-
09.3 - 03.1.2.1
-
09.3 - 03.1.2.2
-
09.3 - 03.1.3
-
09.3 - 03.2.1
-
09.3 - 03.2.2
-
09.3 - 03.2.3
-
09.3 - 03.4.1
-
09.3 - 03.4.2
-
09.3 - 03.4.4
-
09.3 - 03.4.5
-
09.3 - 03.5.2
-
09.3 - 06.2.1
-
09.3 - 06.2.2.1
-
09.3 - 06.2.2.2
-
09.3 - 07.1
-
09.3 - 08.2
-
09.3 - 09.1.1
-
09.3 - 09.2
-
09.3 - 09.4
-
09.3 - 09.5
-
09.3 - 11.1.1
-
09.3 - 11.3.2
-
09.3 - 19.1.2
-
02.1 Ops Planning and Control Activity Insight Model
-
02.2 Operate Asset Activity Insight Model
-
03.1.1 Define Fleet Composition Activity Insight Model
-
03.1.2.1 Determine Requirements and Context Activity Insight Model
-
03.1.2.2 Plan Development of Structures and Resources Activity Insight Model
-
03.1.3 Plan Upgrades Activity Insight Model
-
03.2.1 Initiate Fleet Composition Change Activity Insight Model
-
03.2.2 Monitor and Control Fleet Composition Change Activity Insight Model
-
03.2.3 Audit Fleet Capability Activity Insight Model
-
03.4.1 Identify Sustainment Tasks Activity Insight Model
-
03.4.2 Plan and Initiate Sustainment Tasks Activity Insight Model
-
03.4.4 Monitor and Control Sustainment Tasks Activity Insight Model
-
03.4.5 Audit asset Activity Insight Model
-
03.5.2 Match Assets to Op Task Activity Insight Model
-
03.5.3 Allocate Asset to Task Activity Insight Model
-
06.2.1 Administer Change Activity Insight Model
-
06.2.2.1 Perform preliminary assessment Activity Insight Model
-
06.2.2.2 Perform impact assessment Activity Insight Model
-
07.1 Event Management Activity Insight Model
-
08.2 Plan Training Activity Insight Model
-
09. Engineering Activity Model
-
09.1 Design Product Activity Model
-
09.1.1 Design Physical Product Activity Insight Model
-
09.2 Design Support Solution Activity Insight Model
-
09.3 Design Intent Activity Insight Model
-
09.4 Manage Safety Activity Insight Model
-
09.5 Manage Environment Activity Insight Model
-
10.2.3.4 Manage Obsolescence Activity Insight Model
-
10.2.3.6 Manage bans, constraints and concessions Activity Insight Model
-
10.6.1 Manage Packs and Assemblies Activity Insight Model
-
10.6.2 Manage Items with Shelf Life Activity Insight Model
-
11.1.1 Scope Maintenance Activity Insight Model
-
11.2.2 Perform Maintenance Task Activity Insight Model
-
11.3.2 Maintenance Exception Handling Activity Insight Model
-
11.3.3 Report Maintenance Activity Insight Model
-
14.1 Corporate Governance Activity Insight Model
-
15. Manufacture / Source Activity Insight Model
-
18.1 Business Strategy Activity Insight Model
-
19.2 Approval to Purchase Activity Model
-
19.2.2 Grant / Deny Approval to Purchase Activity Insight Model
-
ENGINEER Activity Model
C.2 Initial Design
Level 1
